This product is made to order and has a 4-6 week lead time before shipping. I send photos for your approval before I ship it out. Attention! The planter boxes are not included. In order to reduce shipping and handling costs, I will be not installing (screwing on) the included shelves. The shelves will need to be screwed into place using a Phillips head screw driver into two holes that have been pre-drilled and numbered accordingly. The screws will also be supplied. No two pieces are the same… March 28, 2017 at 11:32AM

This product is made to order and has a 4-6 week lead time before shipping. I send photos for your approval before I ship it out. Attention! The planter boxes are not included. In order to reduce shipping and handling costs, I will be not installing (screwing on) the included shelves. The shelves will need to be screwed into place using a Phillips head screw driver into two holes that have been pre-drilled and numbered accordingly. The screws will also be supplied. No two pieces are the same…
« The Ultimate Inspiration Guide For Painted Furniture Makeovers March 28, 2017 at 11:22AM (Previous Post)